New asphalt driveway
Excavation, geotextile where needed, compacted stone base and two lifts of hot mix.
We excavate to a stable subgrade, install compacted aggregate, and place asphalt in measured lifts. Your written estimate states compacted thickness in inches so you can compare bids honestly.
Square foot pricing shown is typical. Every job is measured and quoted on site.
Excavation, geotextile where needed, compacted stone base and two lifts of hot mix.
For surfaces that are worn but structurally sound, we mill the edges and place a fresh 1.5 inch lift.
Two coat commercial grade sealer applied after crack filling, best done every three years.
Hot rubberized crack sealant and full depth patching before small damage becomes a rebuild.
Paving plus layout, ADA compliant stalls, signage and thermoplastic or paint striping.
Regrading, catch basins and swales so water leaves the pavement instead of sitting on it.
Ray Harlow started with one dump truck in 1996 and the company has stayed family run since. We own our paver, rollers and skid steers, so the crew on your property works for us and answers to us. If a job needs to wait a week for the right ground temperature, we tell you rather than laying mix that will not compact.
“Two other bidders wanted to overlay right on top of my crumbling drive. Harlow dug it out, fixed the drainage, and it has been perfect through three winters.”
Bill and Sandra R., Kettering driveway
“They paved our church lot over a long weekend and had it striped and open by Sunday morning as promised.”
Pastor Dwayne H., Commercial lot, Dayton
“Clear estimate, no change orders, and the crew cleaned up the edges by hand.”
Michelle O., Beavercreek driveway
Stay off it for at least 48 hours, and keep heavy vehicles, trailers and dumpsters off for 30 days. Fresh asphalt stays soft while it cures, so avoid parking in the same spot every day for the first few weeks and use plywood under jack stands or kickstands.
We pave from roughly April through October in Ohio. Hot mix needs a ground temperature above about 50 degrees to compact properly. Paving in the cold looks fine on day one and ravels apart the following spring, so we do not do it.
Wait at least a full year after new paving so the surface can cure, then seal about every three years. Sealing more often than that builds up brittle layers that crack. Filling cracks promptly matters more than frequent sealing.
Sometimes, but concrete joints reflect through asphalt as cracks within a couple of years. If the concrete is sound we can rubblize it and use it as base. If it is heaving we remove it. We will tell you which situation you have when we measure.
Send your address and a photo of the area. We measure in person and put the scope in writing before you commit to anything.