Spring startup
Charge the system, check every head, adjust arcs, and set the controller for the season.
We fix the dry corners, the geyser head, and the zone that never shuts off. Head to head coverage and a smart controller usually cut a summer water bill by a third.
Colorado systems need a startup in April and a blowout before the first hard freeze, and we handle both on a route.
Charge the system, check every head, adjust arcs, and set the controller for the season.
Compressed air through every zone so the lines do not split over winter.
Annual test with the paperwork filed to your water district.
Broken heads, cut lines, stuck valves, and wiring faults located and fixed same visit.
Designed zone by zone for your soil and sun, permitted and pressure tested.
Weather based controller installed and programmed, with rebate paperwork included.
Most sprinkler problems in this area are design problems. Zones get overloaded, pressure drops at the far heads, and half the lawn browns while the other half floods. We measure static pressure and flow before we quote anything, then build zones the pressure can actually support.
“Two crews told me I needed a whole new system. Highline found a cracked valve and fixed it for under two hundred.”
Greg P., Highlands Ranch
“Our July water bill dropped ninety dollars after they redid the zones and put in a weather controller.”
Ana V., Centennial
“They blow out our system every October without us calling. That reminder alone is worth it.”
Tom H., Littleton
Aim for the second week of October. A blowout before the first sustained freeze prevents split pipes and cracked valve bodies. Our route runs late September through early November and we schedule repeat customers automatically.
Usually the zone has more heads than the pressure supports, so the far heads never reach full spray. Sometimes a valve diaphragm leaks and the zone weeps between cycles. We test pressure at the head to tell which one it is.
Most Denver area water districts require an annual certified test on any system tied to the potable supply. The test takes about twenty minutes and we file the results with your district so you are not chasing paperwork.
A typical quarter acre yard with five to seven zones takes one to two days. We trench, install, pressure test, and put the sod back the same visit. Grass usually knits back over the trench lines within three weeks.
Spring startups and fall blowouts fill up fast. Call or send a note and we will give you the next open window in your neighborhood.