Rooftop solar system
Tile, shingle and foam roof mounting with a full production estimate before you sign.
We pull twelve months of your TEP usage, model your roof, and show you the production estimate and the payback math. Our own crews do the install, no subcontractors.
Straight pricing per watt, with the incentive math shown separately so you can check it.
Tile, shingle and foam roof mounting with a full production estimate before you sign.
Whole home or critical loads backup sized to run through a summer outage.
Two hundred amp service upgrades where the existing panel cannot take the interconnection.
Closed loop systems that cut the largest remaining load in most Tucson homes.
We service arrays other companies installed, including brands that left the market.
Panels pulled and reinstalled when your roof gets replaced.
Ridgeline started in 2011 with two trucks and a crew that had spent years fixing other people's bad installs. We handle Pima County permitting and TEP interconnection ourselves, and we still service every system we have ever put on a roof. Our warranty covers our workmanship for 25 years, not just the panels.
“The production estimate they gave me in March matched what the system actually made through the summer within four percent.”
Hector V., Oro Valley
“Two other companies told me my panel was fine. Ridgeline showed me why it was not, and did the upgrade in the same week as the install.”
Denise K., Midtown Tucson
“Our installer went out of business. These folks took over service on a system they never touched and had it back online in five days.”
Frank A., Green Valley
About eight to twelve weeks from signed design to switch on. Roughly one day of install work, and the rest is Pima County permitting, inspection and TEP's interconnection queue. We give you a written timeline at signing.
A grid tied system without a battery shuts down during an outage, which is a safety requirement. If keeping the house running matters to you, that is what the battery is for and we will size it to the loads you actually need.
We give you the itemized documentation your accountant will need, including system cost and the in service date. We do not file for you and we will not tell you what your tax situation is.
Tell us and we will inspect it during the site visit. If the roof has under about eight years left it is usually cheaper to replace first than to pay for a removal and reset later.
Send us a recent TEP bill and your address. We will come back with a roof layout, a production estimate and a price per watt.