Shower build, full waterproofing
Bonded membrane or foam system, sloped pan, niche, and flood test.
Twenty four hours of standing water in the pan before a single tile goes on the wall. It is the step that separates a shower from a future insurance claim.
Labor pricing below, material quoted separately from your selections.
Bonded membrane or foam system, sloped pan, niche, and flood test.
Uncoupling membrane over prepared subfloor, including thresholds.
Panels up to 48 by 110 inches set with a leveling system, two person crew.
Subway, zellige, or mosaic with proper outlet cuts and finished edges.
Cable or mat systems installed and tested before and after the thinset goes down.
Cracked tile replacement, failing grout removal, and shower pan diagnosis.
Setline is a three person crew that only does tile, which means we are not squeezing your bathroom in between drywall jobs. Waterproofing systems are installed to the manufacturer's published detail, not a shortcut version, and we photograph each layer before it gets covered. Every wet area gets a 24 hour flood test that you are welcome to inspect.
“They tore out a five year old shower another contractor built and showed us where the membrane just stopped. Ours is done right and photographed.”
Nicole B., shower rebuild, Arvada
“Sixty by sixty inch porcelain panels on a bathroom wall, dead flat, joints you cannot feel with a fingernail.”
Adam T., large format, Denver
“Nine days, on schedule, and they cleaned the site every evening. My hallway survived the whole thing.”
Grace L., full bathroom, Littleton
Almost always the waterproofing system. A cement board and mastic build is cheap and starts failing in a few years, while a bonded sheet or foam system installed to spec costs more up front and lasts decades. Ask any bidder which system they use by name and whether they flood test.
A full bathroom typically takes five to nine working days, and that includes the 24 hour flood test and grout cure time. Rushing those two steps is what causes callbacks, so we build them into the schedule rather than treating them as optional. You get a day by day plan before we start.
On a wood subfloor, yes in nearly every case, because wood moves seasonally and rigid tile does not. The membrane lets the two move independently and is why our floors do not develop cracked grout lines in year three. On a sound concrete slab it is sometimes unnecessary and we will say so.
Sometimes, for repairs. Discontinued tile can occasionally be sourced from salvage or a leftover box in your basement, and we will look before recommending replacement. If the match is close but not exact, running the repair to a natural break line usually reads better than a patch in the middle of a wall.
Estimates take about thirty minutes on site and you get a written scope naming the exact waterproofing system. Evening appointments available.